While waiting for delayed shipping I made a short cabinet which will also store filament etc. I put it on levelling machine castors to make maintenance easier as it is a big lump to move around.
Lovely cabinet but seriously nowhere near enough storage for filament. I wonder how it will fair with the vibration compensation test/calibrate, if it is like my Qidi XP3 it might as well be an RB211 jet engine on a static test rig. Are those castors the ones that turn into feet, like these? I have those on an MBE (molecular beam epitaxy) chamber that I designed, great castors.
If push comes to shove, with “those feet” i will add a paving slab!
The big issue i have is the timber floor. Rather than the machine vibrations. So dead weight might help more than the added (tpe) feet!
If the K2 combo ever arrives this year! I’ll let you know.
At 34kg that machine is a beast, its about 10kg more than my Xplus3 and that’s a big old lump. Had to change desks it was on as it shook too much. Fingers crossed for you. Might look at replacing the Ender 5 plus with a K2plus at some point